Airports
Buildings & Infrastructure

Airports

MEP design and BIM coordination for terminals where downtime is not an option.

Airport terminals are among the most systems-dense buildings we engineer — HVAC, smoke control, baggage power, life-safety and ELV all converging in landside and airside zones that must stay operational around the clock.

C&T delivers fully coordinated MEP designs and federated BIM models for terminals and cargo facilities, resolving clashes before they reach site so construction stays on programme.

163,000 m²

Trivandrum T2 terminal

LOD 300

BIM coordination · BIAL

3

airport projects delivered

How we approach airports

Coordination-first BIM

We resolve clashes in a federated model before they reach site, so dense terminal ceilings and plant rooms install right the first time and construction stays on programme.

Integrated multi-discipline MEP

HVAC, electrical, plumbing, fire and ELV are designed as a single coordinated system across airside and landside — not stitched together from separate silos.

We fit your delivery model

We work direct-to-authority, as on Trivandrum T2, or as the MEP and BIM partner to the lead consultant, as we did with AECOM on BIAL — slotting into whatever structure the project runs on.

MEP Engineering Design
BIM & 3D Modelling
Clash Detection & Coordination
CFD & FEA Analysis
Fig. 01 / 4

What we bring to airports

MEP Engineering Design

Terminal MEP designed as one system — HVAC and smoke control sized for peak passenger loads, baggage-handling power and life-safety integrated from airside to landside.

  • HVAC & smoke control
  • Baggage & FIDS power
  • Plumbing & firefighting
Explore MEP Engineering Design

BIM & 3D Modelling

Federated LOD 300–400 models give architects, structure and services one coordinated source of truth across a 160,000 m² terminal.

  • LOD 300–400 models
  • Federated coordination
  • Quantity extraction
Explore BIM & 3D Modelling

Clash Detection & Coordination

Every service route is clash-checked in Navisworks before it reaches site, so dense terminal ceilings and plant rooms install right the first time.

  • Navisworks clash runs
  • Constructability review
  • Site-rework reduction
Explore Clash Detection & Coordination

CFD & FEA Analysis

Airflow and smoke-movement simulation for large terminal volumes — validating ventilation comfort and evacuation safety before construction begins.

  • Terminal airflow
  • Smoke movement
  • Thermal comfort
Explore CFD & FEA Analysis

Our expertise in airports

  • Terminal HVAC & smoke control
  • Baggage-handling power
  • Airside & apron services
  • Fire detection & suppression
  • Plumbing & drainage
  • ELV, IBMS & controls